Full civils & groundworks package to include reduced level excavation, drainage, foundations, utility installation, storm attenuation tanks & multi sports pitch construction.
The Strabane Academy new build incorporated a full civils and groundworks package, including reduced-level excavation, drainage installation, foundations, utility infrastructure and storm attenuation tanks. The works also included the construction of a multi-sports pitch, providing essential infrastructure for the new school development.