The Randalstown to Castledawson Dualling Project involved extensive drainage and earthworks across approximately 30 km of the mainline. The works included the installation of surface and subsurface drainage, side road and slope drainage, along with machine-controlled grading of sub-base levels for drainage channels and side roads.
Works involved:
• 30 km Mainline surface & subsurface drainage installation
• Side road and slope drainage installation
• Machine control grading of sub base for drainage channel and side roads