The A6 Dungiven to Drumahoe Dualling Project involved a comprehensive package of civil engineering and groundworks. Key works included the installation of mainline surface and subsurface drainage, mammal underpasses, oil interceptor tanks and box culverts, alongside the construction of SUDS ponds. Machine-controlled grading was also undertaken to prepare sub-base levels for drainage channels, the mainline, side roads and Park & Ride car parks.
Works involved:
• Mainline surface & subsurface drainage installation
• Mammal underpass installation
• Oil interceptor tank installation
• Machine control grading of sub base for drainage channel, mainline, side roads and park and ride carparks
• Box culvert installation
• SUDS Pond construction